Crane truck hire gets you a truck with its own folding knuckle boom crane, so one vehicle lifts the load on, carries it and puts it down where you need it. Hardware stores use them for roof trusses, builders for site cabins, farmers for water tanks and importers for a container off a skeletal trailer. Send one request with what you are lifting and where, and crane truck operators near you quote directly.
Price guideAbout R4,500 to R7,500 a day for a 4 to 8 ton crane truck with an operator, R7,000 to R11,500 for 8 to 15 tons and R11,000 to R17,000 for 15 to 34 tons. By the hour it is about R650 to R2,200, VAT excludedA rough guide from published South African prices. Route, mass, dates, diesel, handling and VAT all move it.
The capacity on the door is not the capacity at reach
A truck sold as an "8 ton crane truck" can usually lift its top figure only close to the truck. As the boom reaches out, the safe lift falls fast, so with the boom stretched right out the same crane may only handle a small part of it. Tell the operator three things: the mass of the heaviest piece, how far it must travel from the truck at the furthest point, and whether it goes over a wall or onto a roof. The operator checks the load chart and sends the right size.
Jobs crane trucks handle well
- Roof trusses and steel onto a wall plate or slab
- Pallets of bricks, tiles or blocks over a fence
- Generators, transformers and water tanks onto plinths
- A 6 m container on or off a site (see container transport)
- Site cabins, guard huts and toilet blocks
- Boats in and out of a yard
For a 12 m container fully loaded, a long beam or a machine beyond the crane's chart, ask about a lowbed with a separate mobile crane, or check the flatbed and lowbed page.
Ground, outriggers and space to set up
The crane stands on outriggers that push down hard on the ground. Soft fill, a fresh trench, a paved driveway or a manhole cover can sink or crack under a leg. Say what the ground is, how wide the gate is and whether there are overhead power lines near the lift. Bigger or blind lifts often need a lift plan and a banksman. Ask for an operator who holds a valid certificate for that crane.
How crane truck hire is charged
Operators mostly bill by the hour or the day and set a minimum booking, with the meter often running from the moment the truck leaves the yard, so travel time counts. Waiting while the site clears or the slab cures is billed too. Asking for 8 ton crane truck hire rates in Durban or Pretoria without the reach and mass gets you a guess. If the truck also carries the load across town, ask whether the kilometres are extra. For plain carrying without lifting, truck hire is usually the better buy.
Who asks for this
- Private people
- A water tank onto its stand, a garden shed or a boat out of the backyard.
- Shops and online sellers
- Shop fittings, cold room panels or a safe lifted into an upstairs unit.
- Factories and plants
- Moving a press or compressor to a new bay or loading machines for repair.
- Farms and packhouses
- Reservoir tanks, irrigation pipe bundles, feed bins and small sheds dropped where needed.
- Mines and quarries
- Pumps, cable drums and spares delivered and lifted at a remote shaft.
- Builders and contractors
- Roof trusses, brick pallets, steel and site cabins set down without a separate crane.
- Importers and exporters
- A container lifted off at a site with no forklift or dock.
- Hauliers and owner drivers
- Subcontract lifting for a transporter whose rigid truck has no crane.
Frequently asked questions
Can I find crane truck hire near me?
Send your suburb and job details. The request reaches independent crane truck operators working around you, and they send their own prices. We own no cranes and do no lifting ourselves.
Is there a minimum charge?
Usually yes, often a few hours, and travel from the depot may count. Ask how the clock runs before the truck is booked, and whether a cancelled lift is charged.
Do I need to supply anyone on site?
Someone who knows exactly where the load goes, keeps people clear and can sign the delivery note. For roof work, have your builder ready to receive trusses at the top.
What if the crane cannot reach?
The operator may refuse the lift or bring a bigger truck. Measure the distance from where the truck can park to where the load lands, and send photos of the access.
Related topics
Work it out first
- Volumetric weight calculatorBox sizes, mass, quantity and how it travels in: the volumetric weight and the chargeable weight you pay for out
- CBM and container calculatorCartons or pallets with sizes, mass and count in: the total CBM, the mass and how full a 20 foot, 40 foot or high cube is out
- Truck size and pallet calculatorPallets, mass each, pallet size and loose freight in: the smallest truck that takes it, by floor and by payload, out
